GROUP SITESGroup PortalChilechuan EnergyQingcheng AI ComputingChilechuan DairyChilechuan TourismSupply Chain HubChilechuan Power GroupPower Equipment Research InstituteChilechuan Trading GroupChilechuan Mining GroupChilechuan Chemical GroupGroup Portalwww.clc-group.cnChilechuan Energyenergy.clc-group.cnQingcheng AI Computingaicloud.clc-group.cnChilechuan Dairydairy.clc-group.cnChilechuan Tourismtravel.clc-group.cnSupply Chain Hubscm.clc-group.cnChilechuan Power GroupCurrentpower.clc-group.cnPower Equipment Research Instituternd.clc-group.cnChilechuan Trading Grouptrade.clc-group.cnChilechuan Mining Groupmining.clc-group.cnChilechuan Chemical Groupchem.clc-group.cnpower.enterprise-group.reiy.cn · 11 sitesAdmin Login
West Inner Mongolia dispatch corridors normalSystem frequency 50.00 HzReserve capacity 3.86 M kWHohhot, Inner Mongolia 40.8414°N / 111.7519°E
POWER.CLC-GROUP.CN · English

Safety

Home /Safety Single page Total 3 items

Safety

Single page

West Inner Mongolia–Tianjin South UHV corridor sets a summer peak transmission record

Issued by:Power Dispatch Center Published:2026-09-26 Views 8,662

Chilechuan Power Group · Power Dispatch Center · released 2026-09-26 08:12, distributed across 4 language versions.

[Inner Mongolia · No. 18 Chilechuan Avenue, Saihan District, Hohhot] On 2026-09-26, Chilechuan Power Group published: West Inner Mongolia–Tianjin South UHV corridor sets a summer peak transmission record. Prepared by Power Dispatch Center, reviewed by the Group Brand Center content hub and released under the “Grid Corridor” section.

The matter falls under the Generation Fleet, Grid Corridors, Power Trading, Safety scope of this site. Articles are edited centrally in the group-site backend and released automatically once the OA approval chain (originator → department head → Brand Center → Legal) clears compliance pre-review. AI compliance score for this release: 91.

The release is synced to the group portal, its parent and child sites, and distributed across the language versions each site declares. Every language version is a pre-prepared human translation, proofread centrally before release — no on-request machine translation.

For detailed data definitions, partnership options or formal documents, use the AI assistant at the bottom right of this page, or submit a request via the Contact section — the system generates a website lead in real time and pushes it to the OA workbench.

SectionGrid Corridor
Document No.CLC-2026-00009
Related
252026.09 Ulanqab wind cluster lifts September equivalent utilization hours by 7.4% year on year Section:Generation Mix Issued by:Renewables Division 242026.09 Group’s first long-term green power trade settled at the West Inner Mongolia Power Exchange Section:Power Trading Issued by:Power Trading Center